Gator Xtreme Edge

The Ultimate Reinforced 3D Micro-Fiber mesh Structural Edge

APPLICATION INSTRUCTIONS

Using the established best practices, you will ensure the require base, setting bed and drainage of your hardscape project

INSTALLATION STEPS

Always refer to the latest GATOR XTREME EDGE Technical Data Sheet (TDS) at AllianceGator.com before installing GATOR XTREME EDGE. Concrete pavers, slabs, Natural and Wet cast stones should be installed according to the industry established best practices for the base, setting bed, and drainage of a hardscape project.

STEP 1 REMOVING BEDDING MATERIAL

Remove all excess bedding material 10 cm at the edge of the hardscape project (See photo on the right).

STEP 2 MIXING GATOR XTREME EDGE

Mix 1.7 liter of water with one bag 20 kg of XTREME EDGE until you obtain a homogeneous mixture.

STEP 3 TROWEL GATOR XTREME EDGE 30° ANGLE
Create a triangular shaped wedge of GATOR XTREME EDGE against the side of the pavement. With the help of a trowel spread approximately 10 cm of GATOR XTREME EDGE mixture at a 30° angle over the base material . Ensure that the GATOR XTREME EDGE covers any void spaces and at least 25 mm of the vertical side of the paver or half the height of the hardscaping material being used
STEP 4 COMPACTION OF THE PAVED SURFACE
Final compaction of the paved surface with the XP G2 sand should take place while the GATOR XTREME EDGE is still curing. As with Gator Nitro Sand the paved surface should be compacted 90 minutes after GATOR XTREME EDGE installation.