GATOR BASE CALCULATOR

Combat Labor Shortage with Gator Base

See below a project cost analysis of a Traditional Way VS Gator Base Way.

Take the challenge and save at least 20% labor for your next project.

This self calculator below is an example of a Traditional Way VS Gator Base Way project including the same working team in both scenarios.

Fill in all the empty cells and you will obtain a project cost analysis of both Traditional Way and Gator Base Way.

GREEN represents man hours. YELLOW represents equipment hours.GREY represents material needed.

PROJECT: BACKYARD, WITH EASY ACCESS

Project Size Length Width SQ. FT.
Total paved surface area:
Crew: laborers foremen Overhead equipment / hour
Enter crew members:
Hourly wage per crew member including benefits
Hourly overhead equipment usage. Ex: Excavation mechanical equipment (truck, excavator and equipment)

EXCAVATION COST

Traditional Way

Gator Base Way

Type QTY PER / HOUR TOTAL ($) QTY PER / HOUR TOTAL ($)
Laborers cost of: excavating, loading and transporting Ex: 2 men 5 hours at $25.00 / hours = 10 hours total at $25.00 / hour Hours
Foreman cost of: excavating, loading and transporting Ex: 1 man 5 hours at $45.00 / hours = 5 hours at $45.00 / hour Hours
Overhead equipment usage hourly Ex: Excavation mechanical equipment (truck, excavator and equipment) (average $135/ hour) Hours
The amount of cubic yards and disposal cost per yard of 10'' excavation material of the paved area with an average 23% (fluff factor) loose (enter cost of disposal) Cubic yards
The excavation cost is self calculated.
Subtotal
Subtotal

Base preparation cost

Traditional Way

Gator Base Way

Type QTY COST ($) TOTAL ($) QTY EACH ($) TOTAL ($)
Quantity needed and cost of crushed stone #57 by the Cubic yards or Tons (6 5/8'' compacted base) Cubic yards - - -
TONS - - -
Quantity needed and cost of 1'' bedding sand layer Cubic yards
TONS
Laborers cost of: transporting, levelling & compacting crushed stone Ex: 2 men 2 hours = 4 hours at $25,00 / hour Hours
Foreman cost of: transporting, levelling & compacting crushed stone $45.00 / hour Hours
Labor cost of: transporting, levelling & compacting bedding layer 2 men x 0.75 hours = 1.5 hours at $25.00 / hour Hours
Overhead equipment usage hourly cost of equipment for transporting, levelling & compacting and or backfilling (average $135/ hour) Hours
Quantity and cost of Gator Fabric per sq.ft. needed, including 6" exceeding paved surface SQ. FT.
Quantity and cost of Gator Base per sq.ft. needed, including 6" exceeding paved surface Panels - - 0.00
Amount of labor hours and cost to lay Gator Base Ex: 2 men 0.5 hours at $25.00 / hour = 1 hour at $25.00 / hour Per / Hour - - 0.00
Cost for the base preparation is self calculated.
Subtotal
Subtotal
Traditional way total
Gator Base way total

Total project savings using gator base way:

Total percentage savings by using Gator Base Way:

Total man hours for Traditional Way:

Total overhead equipment usage for Traditional Way:

Total man hours for Gator Base Way:

Total overhead equipment usage for Gator Base Way:


CONCLUSION


Total savings for this project:

or per SQ.FT.

Including Labor & Overhead equipment hours.

To view our Gator Base calculator please visit this page on a laptop or desktop computer.