GATOR EDGE X4

4 FEET LONG • STRAIGHT OR CURVED USE

Installation Instructions

STEP 1

GATOR EDGE X4 can be installed either before or after the paver installation.

STEP 2

Use one 10″ nail every second hole and at every “SNAP & LOCK” junction, this will ensure continuous lateral support. Ensure the GATOR EDGE X4 is installed firmly against the pavers on a minimal compacted structural aggregate base of 6″ (15 cm) deep and wider on all sides of the paved area.

STEP 3

When using Gator Base, use Gator Base Screws at every second hole and every “SNAP & LOCK” junction to ensure continuous lateral support. Ensure the GATOR EDGE X4 is installed firmly against the pavers. The Gator Base must be 6″ (15 cm) wider on all sides than the paved area.