Gator Xtreme Edge

The Ultimate Reinforced 3D Micro-Fiber mesh Structural Edge

APPLICATION INSTRUCTIONS

APPLICATION DIAGRAMS - FOUNDATION OPTIONS

Using ICPI established best practices from ICPI Tech Spec 2 and ICPI Tech Spec 10, you will ensure the require base, setting bed and drainage of your hardscape project.

INSTALLATION STEPS

Always refer to the latest GATOR XTREME EDGE Technical Data Sheet (TDS) at AllianceGator.com before installing GATOR XTREME EDGE. Concrete pavers, slabs, Natural and Wet cast stones should be installed according to ICPI Tech Spec 2 and for overlay application ICPI Tech Spec 10, utilizing industry established best practices for the base, setting bed, and drainage of a hardscape project.

STEP 1 REMOVING BEDDING MATERIAL

Using a trowel, remove all excess sand/aggregate bedding along the project pavers to a width of 10 cm (4”) and under the pavers 13 to 25 mm (1/2” to 1”) of the bedding of the hardscape project. (see Traditional, open graded or permeable application on previous page). The GATOR XTREME EDGE will be laid on a strong structural foundation.

For a Gator Base installation, cut the Gator Base flush with the edge of the hardscape project and remove approximately 4″ (10 cm) wide by 1″ (25 mm) deep in the native soils along the edge (see Gator Base cross section diagram on previous page).

STEP 2 MIXING GATOR XTREME EDGE

Mix 1/2 US gallon (1.9 liters) of water with one bag 50 lb (22.7 kg) of GATOR XTREME EDGE until you obtain a homogeneous mixture.

STEP 3 TROWEL GATOR XTREME EDGE 30° ANGLE

Create a triangular shaped wedge of GATOR XTREME EDGE against the side of the pavement. With the help of a trowel spread approximately 4″ (10 cm) of GATOR XTREME EDGE mixture at a 30° angle over the base material (Photo 1) or native soil in a Gator Base application (Photo 2). Ensure that the GATOR XTREME EDGE covers any void spaces and at least 1″ (25 mm) of the vertical side of the paver or 1/2 the height of the hardscaping material being used. One bag of GATOR XTREME EDGE edging will cover approximately 4.5 m (15 ft) of edging and for Gator Base application approximately 3.7 m (12 ft).

STEP 4 COMPACTION OF THE PAVED SURFACE

Final compaction of the paved surface with the G2 sand should take place while the GATOR XTREME EDGE is still curing. As with Gator Nitro or Gator Nitro-X sands the paved surface should be applied only 90 minutes after GATOR XTREME EDGE installation.

Conversion of measurement units
1/2 US gallon = 2 quarts = 64 fl.oz = 1.9 liters

Hello!